According to Mark III and CS1 membrane sealing systems, dry LNG ships will be used in the
It is initiated into membrane structures and liquid gas storage structures. The initiating membrane structure includes a membrane formed by multiple creases on the surface, a wedge inserted inside the crease, and at least one strip attached to the two sides of the wedge from the underside of the crease to support the underside of the wedge, and the movement of the membrane may prevent the wedge from being detached from the crease, thereby preventing damage to the membrane used as a membrane.
1. Products : EPS Wedge Belt System
2. Products Size : External Flood Control Scope Minute
Type A : 260mm × 35mm × 32mm / Type B : 60.8mm × 38mm × 55mm
Type C : 100mm × 60.8mm × 34.1mm
3. Material : EPS(Expandable Polystyrene)
4. Method of Manufacture : Assembly After Forming
5. Condition of supply : List of EPS Wedge Belt System Products Supply