Inner Mongolia Zhenjin Energy Development Co., LTD.

Ordos city, Inner Mongolia autonomous region.
Room 102, unit 102, unit 2, building 4, east tiejin road, dongsheng district,
Ordos city,  Inner Mongolia autonomous region.  017099

China
(86) 13518019026
http://www.nmzhenjin.com
  • Booth: 8021


Business cooperation consultation:zhtao2015@163.com 

Inner Mongolia Zhenjin Energy Development Co., Ltd. registered in Dongsheng District, Ordos City, Inner Mongolia, mainly engaged in the research and development of prying LNG/CNG equipment for recovery of oil field gas, coal bed methane, methane and chemical tail gas.Production and sales,complete sets of equipment technical services.


 Press Releases

  • The company has now developed 5×10⁴Nm³/d and 3.5×10⁴Nm³/d LNG series skid mounted unit, which is the first domestic small modular LNG skid-mounted equipment developed by our company.At present, the two sets of pry installation equipment are in stable operation, with high technology content, mature technology, advanced equipment control, safe and reliable operation, outstanding economic benefits, etc.

    Adhering to the integrity of the company, we are willing to develop together with you and spare no pains to achieve mutual benefit.

    Please feel free to contact:

    张洪涛hongtao Zhang             陈光毅guangyi Chen
    电话Contact:(86)13518019026     电话Contact:+1(832)916-0125

    邮箱E-mail:nmgzjtj@163.com       邮箱E-mail:cgy.adrin@gmail.com

    网址Website:www.nmzhenjin.com

     

  • To promote the promotion of new energy, local government policy response, real-time gas supply points, and signed the "gasification" agreement with Yi he wu su of the local government,thus Yi he wu su and Inner Mongolia Zhenjin formed an integral whole.

    This project on June 18, 2017 flat temporary gas supply points, after 20 days of surveying and mapping, and enter a crime scene investigation, on July 9, 2017, started on 18 minutes, 11 o 'clock lasted 79 days, formal ventilation on October 25.

  • Inner Mongolia Zhenjin Energy Development Co., Ltd. was established on July 27, 2015, with a registered capital of 20 million yuan. It is registered in Dongsheng District of Ordos City, Inner Mongolia. It is mainly engaged in the research and development of prying LNG/CNG equipment for recovery of oil field gas, coal bed methane, methane and chemical tail gas.Production and sales, as well as pry processing unit process technology and complete sets of equipment technical services.

    The newly researched dry adsorption purification technology of natural gas in our company can remove the saturated water, heavy hydrocarbon and CO2 in the raw gas at one time, without complicated plant flow, the whole process automation does not need personnel operation, and the device has high safety.

    As natural gas and industrial gas processing and packaging technology leader, the company in technology innovation, research and development ability, production equipment, product quality is set up with more than 20 years of development history and production experience of technical team, with professional r&d trial base and the core patent technology, is the collection device prizing the design, development,pry into manufacturing and production operations, pried into sales, and outsourcing services "five one" the professional company.Leading the industry to develop continuously in the direction of intelligent, efficient, safe and green, and strive to build the brand of "Inner Mongolia zhenjin".

    At present, the company LNG/CNG prying equipment have been sold to Inner Mongolia, Shanxi, Yunnan Hubei and other domestic provinces, in the domestic market,the company prying equipment of LNG/CNG always keep a safe and stable yield, for domestic users to provide a stable source gas, to fulfill the responsibility, set up the image, regulate the service, to win the market.The company will unswervingly follow the road of high technology development, and make unremitting efforts for the progress of the industry and pry upgrade.

    The newly researched dry adsorption purification technology of natural gas in our company can remove the saturated water, heavy hydrocarbon and CO2 in the raw gas at one time, without complicated plant flow, the whole process automation does not need personnel operation, and the device has high safety.


 Products

  • 50,000 Nm3/d modular LNG plant.
    The installation of this device is a natural gas liquefaction plant with a scale of 5×10⁴Nm³/d,This LNG plant is the first domestic small pry modular LNG device developed by our company.<br />...

  • The installation of this device is a natural gas liquefaction plant with a scale of 5×10⁴Nm³/d, and the operating flexibility is 50%-110%.This LNG plant is the first domestic small pry modular LNG device developed by our company.

    The plant process equipment includes filtration pressure, acid gas removal, dehydration, mercury removal, liquefaction, storage and transportation systems.Public works include instrument wind and nitrogen system.According to the scale of the equipment, the advanced liquefaction technology is selected--refrigeration process of mixed refrigerant refrigeration.This process has the characteristics of low energy consumption, short technological process and safe operation.The technology of mixed refrigerant refrigeration is the integrated innovation and application of mature technology.

    The equipment is advanced and safe and reliable.High degree of automation;The environmental protection industry encouraged by the state;Energy consumption is lower than the industry average.

     

  • 30,000 Nm3/d container LNG plant.
    This device to deal with every day 3.5x104Sm³/d(20℃,101.325Kpa)raw material gas, by LNG natural gas purification, liquefaction process to form products LNG,load and sell by loading hose....

  • This device to deal with every day 3.5x104Sm³/d(20℃,101.325Kpa)raw material gas, by LNG natural gas purification, liquefaction process to form products LNG,load and sell by loading hose.

    This device for my company independent research and development of the domestic first set of container type device prizing LNG plant, adopt the domestic initiative of the five towers purification technology and the domestic leading the four components of mixed refrigerant liquefaction technology, through the container type device prizing together, this device is by far the most convenient, flexible, safe, high rate of return of mobile device prizing type LNG plant.

    The device has 6 container pry, which can be easily moved by the car hauling container, and the pry position can be flexibly arranged in different conditions.The device can be produced in place without foundation and so on. It is flexible and convenient,and it really does the mobile pry.

     

     

     

  • CNG processing device
    CNG processing device...

  • The maximum allowable input pressure of the gas from the wellhead is 32MPa. After the heating furnace of the water jacket, after the heating, the pressure is reduced by the throttle and the lower pressure <25MPa, and then enters the water jacket separator, and the initial gas liquid is separated.After the separation, the natural gas goes into the pre-dehydration device for deep dehydration, and the natural gas is filled with the tank car through the filling port of the compressor.When the wellhead pressure is lower than 20 mpa, this set of high-pressure direct filling device the system pressure is flat from pressure tank lorry, tank lorry pressure after filling, pressurized by compressor, the pressure of the tank truck is loaded to the tank it requirements.


Send Email

Type your information and click "Send Email" to send an email to this exhibitor. To return to the previous screen without saving, click "Reset".


Please contact otc.events@otcnet.org for questions.
For technical assistance please contact: support