The Biggest Thing We Move is Time

Uptime. Turnaround time. Time to market. To our customers, time is the currency that matters most. That’s why we strive to bring deadlines forward. It’s an integrated, daily effort shared by Mammoet employees. Time isn’t set in concrete. Or forged in steel. It’s not even all that heavy. And yet, it’s the biggest thing we can move for you.


 Press Releases


  •  

    A consortium building an offshore oil and gas platform in Brazil suffered an unexpected problem when one of their contractors pulled out mid-project. The deadline for the P76 floating production storage and offloading (FPSO) unit was imminent – and the client faced a financial penalty if it was not completed on time. Mammoet responded immediately, deploying the PTC 200-DS ring crane and a crew working twin shifts to make up the lost time. Mammoet completed the P76 project swiftly and safely, enabling the offshore facility to be brought into operation within the short timescale.

    Construction of the P76 FPSO platform at the Techint Offshore Unit in Pontal do Paraná, Brazil, had been carefully planned to an agreed schedule. But when a key contractor withdrew from the project, the construction consortium prepared to be fined for failing to meet the deadline. The only solution was to find a high capacity crane and experienced crew that could be mobilized immediately. The consortium turned to Mammoet for help.


    Mammoet assembled a PTC (platform, twin ring, containerized) crane on-site and had it ready for use within three months – an extremely short time for such a large and complex piece of machinery. To make optimum use of the limited time, Mammoet also mobilized a second crew to work a night shift, both crews working seven days a week. This approach reduced the time taken for the installation by an estimated 30-40%.


    Getting to work immediately, 30 modules – ranging from 190 to 1,980 tons – were weighed and transported, ready for installation by the PTC. Mammoet’s in-house designed adjustable rigging frame was deployed, reducing the need for complex rigging arrangements and adjustments. This, combined with the PTC’s long reach, small footprint and rapid lifting ability maximized the efficiency of the integration process.

    http://www.mammoet.com/cases/project-p76/