Bardex® Corporation  

6338 Lindmar Drive
Goleta,  CA  93117

United States
http://www.bardex.com
  • Booth: 2349

Bardex® provides novel engineering insights and designs, prototypes, and manufactures proprietary equipment to solve the marine industry’s heaviest challenges.  For over 60 years – and 300+ projects for shipyards, ports, and the offshore energy industries, the Bardex® mindset has always been to be a trusted, collaborative partner whose first step in any project is to understand exactly what the client needs to accomplish. That approach has produced more than 20 patents, many repeat clients, and countless innovations that make the seemingly impossible possible, while improving safety, efficiency, and our client's profitability for a diverse range of applications. Bardex facilities are ISO 9001, ISO 14001, and ISO 45001 certified. To learn more, visit https://www.bardex.com , and follow them on LinkedIn to stay in touch.


 Press Releases

  • HOUSTON, August 14, 2024 – Bardex®, a global leader in solutions for marine-based heavy lifting, transfer, and restraint has completed its phase of floating production system (FPS) for the Shenandoah project: delivering its award-winning Off Vessel Tensioning (OVT) BarLatch™ mooring system. When installed, the FPS will be located in the deepwater Gulf of Mexico at over 1800 m water depth.

    This is the second FPS project in which Bardex partnered with HD Hyundai Heavy Industries to supply its patented OVT BarLatch system. The first was the King’s Quay FPS, also moored in the Gulf of Mexico, which marked the inaugural implementation of Bardex’s OVT method. According to an engineer who was involved in both projects, Bardex was selected for the King’s Quay project specifically for its OVT system, along with a proven record of adapting quickly to changing requirements and managing interfaces effectively.

    In May of this year, the OVT BarLatch system earned Bardex the Woelfel Best Mechanical Engineering Achievement award, conferred by the American Society of Mechanical Engineers. Bardex designed the OVT method to work with its patented BarLatch Fairlead Stopper technology. Development of the product resulted from working with a client who wanted to address the longstanding industry concern with in-plane and out-of-plane bending fatigue and chain wear at the conventional 7-pocket underwater fairlead. Additionally, the client wanted to eliminate deck tensioning equipment. The BarLatch Fairlead Stopper solution for off-vessel tensioning of mooring lines uses an Anchor Handling Tug Supply (AHTS) or similar vessel to apply the tension resulting in multiple benefits.

    The OVT method:

    • Makes platforms storm-safe significantly faster

    • Frees up deck space and reduces topside weight anywhere from 600 to 1,000 metric tons by eliminating the equipment needed for chain tensioning and handling

    • Frees up space and reduces weight, allowing for the addition of revenue-producing processing equipment or the use of vessels with smaller hulls, which reduces upfront vessel expenditure

    The OVT and BarLatch system can be used in any region of the world and is approved by major certifying bodies, including the American Bureau of Shipping (ABS), Bureau Veritas (BV), and Det Norske Veritas (DNV). Bardex’s OVT method is also applicable to the offshore wind industry.

    For more information about Bardex’s Off Vessel Tensioning, visit https://www.bardex.com/applications/mooring-tensioning/off-vessel-tensioning-oil-gas/.


 Products

  • BarMoor™ Quick Connector
    Bardex® is answering the industry’s call for a simpler, more reliable mooring connector....

  • The BarMoor™ Quick Connector features a simple and fast way to hook up mooring lines and also disconnect to tow the FOWT back to port in case of major turbine maintenance; pull in to latch the connector in place, pull in again to open latches for disconnect. The arrangement of the BarMoorTM Quick Connector and design of the foundation structure can be modified to suit any hull configuration. The size of the components may also be scaled to accommodate larger loads, various water depths, or extended system design life. The component parts are simple, can be produced in mass quantity, and do not have highly precision machined parts making them more reliable and less prone to fabrication defects or assembly errors. Finally, the BarMoorTM Quick Connectors can be used to reduce offshore risks and shorten the time necessary to install mooring lines. And as your heavyweight mooring coach, you can count on us to bring elite offshore expertise to your corner for a smooth installation process. 

Send Email

Type your information and click "Send Email" to send an email to this exhibitor. To return to the previous screen without saving, click "Reset".


Please contact otc.events@otcnet.org for questions